diff options
author | Thorsten Leemhuis <fedora@leemhuis.info> | 2016-03-08 08:40:56 +0100 |
---|---|---|
committer | Thorsten Leemhuis <fedora@leemhuis.info> | 2016-03-08 08:40:56 +0100 |
commit | dd90e0aaca71357e4a65af1f6f3cac20d065cacf (patch) | |
tree | 463f1a7c33485bb199d29de1ecc447653c0103f9 /ARM-mvebu-change-order-of-ethernet-DT-nodes-on-Armada-38x.patch | |
parent | 2179ae0204c3319702fa1cd9891f02563ddc9e88 (diff) | |
parent | 227db8a8ef292311daedca20ccdd95cf6a226057 (diff) | |
download | kernel-dd90e0aaca71357e4a65af1f6f3cac20d065cacf.tar.gz kernel-dd90e0aaca71357e4a65af1f6f3cac20d065cacf.tar.xz kernel-dd90e0aaca71357e4a65af1f6f3cac20d065cacf.zip |
Merge remote-tracking branch 'origin/master' into f24-user-thl-vanilla-rawhidekernel-4.5.0-0.rc7.git0.2.vanilla.knurd.1.fc24
Diffstat (limited to 'ARM-mvebu-change-order-of-ethernet-DT-nodes-on-Armada-38x.patch')
-rw-r--r-- | ARM-mvebu-change-order-of-ethernet-DT-nodes-on-Armada-38x.patch | 101 |
1 files changed, 101 insertions, 0 deletions
diff --git a/ARM-mvebu-change-order-of-ethernet-DT-nodes-on-Armada-38x.patch b/ARM-mvebu-change-order-of-ethernet-DT-nodes-on-Armada-38x.patch new file mode 100644 index 000000000..cff3d3339 --- /dev/null +++ b/ARM-mvebu-change-order-of-ethernet-DT-nodes-on-Armada-38x.patch @@ -0,0 +1,101 @@ +From patchwork Wed Jan 27 15:08:19 2016 +Content-Type: text/plain; charset="utf-8" +MIME-Version: 1.0 +Content-Transfer-Encoding: 7bit +Subject: [1/2] ARM: mvebu: change order of ethernet DT nodes on Armada 38x +From: Thomas Petazzoni <thomas.petazzoni@free-electrons.com> +X-Patchwork-Id: 8134751 +Message-Id: <1453907300-28283-2-git-send-email-thomas.petazzoni@free-electrons.com> +To: Jason Cooper <jason@lakedaemon.net>, Andrew Lunn <andrew@lunn.ch>, + Sebastian Hesselbarth <sebastian.hesselbarth@gmail.com>, + Gregory Clement <gregory.clement@free-electrons.com> +Cc: Nadav Haklai <nadavh@marvell.com>, Lior Amsalem <alior@marvell.com>, + Thomas Petazzoni <thomas.petazzoni@free-electrons.com>, + linux-arm-kernel@lists.infradead.org +Date: Wed, 27 Jan 2016 16:08:19 +0100 + +On Armada 38x, the available network interfaces are: + + - port 0, at 0x70000 + - port 1, at 0x30000 + - port 2, at 0x34000 + +Due to the rule saying that DT nodes should be ordered by register +addresses, the network interfaces are probed in this order: + + - port 1, at 0x30000, which gets named eth0 + - port 2, at 0x34000, which gets named eth1 + - port 0, at 0x70000, which gets named eth2 + +(if all three ports are enabled at the board level) + +Unfortunately, the network subsystem doesn't provide any way to rename +network interfaces from the kernel (it can only be done from +userspace). So, the default naming of the network interfaces is very +confusing as it doesn't match the datasheet, nor the naming of the +interfaces in the bootloader, nor the naming of the interfaces on +labels printed on the board. + +For example, on the Armada 388 GP, the board has two ports, labelled +GE0 and GE1. One has to know that GE0 is eth1 and GE1 is eth0, which +isn't really obvious. + +In order to solve this, this patch proposes to exceptionaly violate +the rule of "order DT nodes by register address", and put the 0x70000 +node before the 0x30000 node, so that network interfaces get named in +a more natural way. + +Signed-off-by: Thomas Petazzoni <thomas.petazzoni@free-electrons.com> + +--- +arch/arm/boot/dts/armada-38x.dtsi | 30 +++++++++++++++++++++--------- + 1 file changed, 21 insertions(+), 9 deletions(-) + +diff --git a/arch/arm/boot/dts/armada-38x.dtsi b/arch/arm/boot/dts/armada-38x.dtsi +index e8b7f67..b50784d 100644 +--- a/arch/arm/boot/dts/armada-38x.dtsi ++++ b/arch/arm/boot/dts/armada-38x.dtsi +@@ -429,6 +429,27 @@ + reg = <0x22000 0x1000>; + }; + ++ /* ++ * As a special exception to the "order by ++ * register address" rule, the eth0 node is ++ * placed here to ensure that it gets ++ * registered as the first interface, since ++ * the network subsystem doesn't allow naming ++ * interfaces using DT aliases. Without this, ++ * the ordering of interfaces is different ++ * from the one used in U-Boot and the ++ * labeling of interfaces on the boards, which ++ * is very confusing for users. ++ */ ++ eth0: ethernet@70000 { ++ compatible = "marvell,armada-370-neta"; ++ reg = <0x70000 0x4000>; ++ interrupts-extended = <&mpic 8>; ++ clocks = <&gateclk 4>; ++ tx-csum-limit = <9800>; ++ status = "disabled"; ++ }; ++ + eth1: ethernet@30000 { + compatible = "marvell,armada-370-neta"; + reg = <0x30000 0x4000>; +@@ -493,15 +514,6 @@ + }; + }; + +- eth0: ethernet@70000 { +- compatible = "marvell,armada-370-neta"; +- reg = <0x70000 0x4000>; +- interrupts-extended = <&mpic 8>; +- clocks = <&gateclk 4>; +- tx-csum-limit = <9800>; +- status = "disabled"; +- }; +- + mdio: mdio@72004 { + #address-cells = <1>; + #size-cells = <0>; |